A structural footing system perfect for your project.
Structurally Rated
Diamond Piers are pre-cast, manufactured structural footings. They are not subject to variables in the field that weaken site poured concrete footings.
Speed
Don’t drill 2′ by 5′ deep holes and wait for a solid concrete footing to cure. Set 6-8 footings in no time and begin construction the same day.
Eliminate Downtime
Hollow tubes allow for construction to begin immediately. After installation, your inspector can measure the footing depth by inserting his tape measure into the pipe.
No Excavation
Diamond Piers install into existing landscaping, not disturbing the surrounding areas. Piers require minimal excavation, and no specialty hole diggers.